Working with PJ Hegarty Construction Wall Steel manufactured and fitted all the Structural Steel and fitted the 18000 sqm of decking for this project.

Detail:
Tonnage: 3500 Tonnes
Main Contractor: PJ Hegarty Construction
Architect: Pascal and Watson
Engineer: Arup Consulting Engineers
Wall Steel Project Manager: JJ Ward

Project Details:
Wall Steel was the Structural Steel contractor for Pier E, the airside section of Dublin Airport’s Terminal 2 development. Dublin Airport’s Pier E/ Terminal 2 was the largest construction site in Ireland with over 2000 people working on site at its peak. The overall value of the Terminal 2 project is €609 million.

The project consisted of the provision of 3500 tonnes of structural steel and 18000 square metres of decking, Pier E is 400 meters long with 11 fixed links and Node Buildings and a Link Bridge connection to Terminal 2 spanning over 30m. Wall Steel worked closely with PJ Hegarty the main contractor on this site and the Dublin Airport Authority to ensure that the project was delivered on program.

  • Dublin-Airport-Pier-E-exteriorDublin-Airport-Pier-E-exterior
  • Dublin-Airport-Pier-E-Under-Construction-1Dublin-Airport-Pier-E-Under-Construction-1
  • Dublin-Airport-Pier-E-Under-Construction-2Dublin-Airport-Pier-E-Under-Construction-2
  • Dublin-Airport-Pier-E-under-Construction-3Dublin-Airport-Pier-E-under-Construction-3
  • Pier-Centre-Roof-structurePier-Centre-Roof-structure
  • Dublin-Airport-Pier-E-Complete-1Dublin-Airport-Pier-E-Complete-1
  • Dublin-Airport-Complete-2Dublin-Airport-Complete-2
  • Dublin-Airport-Pier-E-Aerial-1Dublin-Airport-Pier-E-Aerial-1
  • Dublin-Airport-Pier-E-Aerial-2Dublin-Airport-Pier-E-Aerial-2
  • Pier-E-Eave-detailPier-E-Eave-detail

« Previous     Next »